The objective is: 
924.893
The running time is: 
1763.11
The time meeting best is: 
1548.13
Location: 12(load: 788) 
 Route 0(load: 150) 103 110 99 98 130 100 134 133 122 148 
 Route 1(load: 150) 126 101 149 104 143 136 125 107 121 116 
 Route 2(load: 149) 109 138 102 129 140 132 128 117 137 
 Route 3(load: 148) 124 127 108 119 114 118 105 144 131 115 
 Route 4(load: 49) 146 113 106 
 Route 5(load: 142) 147 141 123 120 135 142 145 111 139 112 
Location: 15(load: 735) 
 Route 0(load: 147) 27 37 10 48 14 22 0 44 9 46 
 Route 1(load: 150) 1 42 11 7 20 12 23 47 24 5 
 Route 2(load: 150) 41 3 25 17 13 35 4 38 2 26 
 Route 3(load: 143) 34 19 30 29 16 6 36 43 40 18 
 Route 4(load: 145) 28 33 8 15 39 31 21 32 45 
Location: 16(load: 749) 
 Route 0(load: 150) 72 50 81 77 59 70 49 90 89 91 
 Route 1(load: 150) 61 74 67 52 64 68 84 54 51 69 
 Route 2(load: 150) 57 87 96 76 73 93 66 53 86 94 
 Route 3(load: 149) 75 92 55 65 56 63 80 82 79 88 
 Route 4(load: 150) 95 58 62 83 60 85 78 97 71 
The actual cost is 924.893
